Key Draft Logo
Key Draft Logo

At KeyDraft Designs, we specialize in high-quality architectural design solutions tailored to meet the unique needs of homeowners, builders, and developers.

We understand that great design is a balance of functionality, aesthetics, and affordability.

Navigating the world of building permits in Ontario has always been a complex endeavor, but the introduction of the Ontario Building Code (OBC) 2025 updates has shifted the landscape significantly for homeowners and developers. Whether you are planning a legal basement apartment, a garden suite, or a complete house conversion, understanding the technical distinction between Part 9 and Part 11 is the difference between a smooth approval and a costly rejection.

At KeyDraft Designs, we specialize in translating these complex technicalities into actionable custom home designs. This guide will break down the crucial differences between Part 9 (Housing and Small Buildings) and Part 11 (Renovations/Change of Use), highlighting the new 2025 relaxations that make it easier than ever to create a Second Dwelling Unit (SDU).


Table of Contents

  1. The Core Difference: When to Use Part 9 vs. Part 11
  2. The 2025 OBC Revolution: Major Relaxations for SDUs
  3. Fire Safety Reimagined: "Smoke-Tight" vs. "Fire-Rated"
  4. Structural Foundations: Underpinning and Wall Removals
  5. Zoning and the Committee of Adjustment: Clearing the Path
  6. Your Step-by-Step Compliance Roadmap for 2026

1. The Core Difference: When to Use Part 9 vs. Part 11

The first question we ask every client at KeyDraft Designs is: "How old is your home?" This single detail determines which set of rules the City of Toronto, Mississauga, or Brampton will apply to your project.

Part 9: The Standard for New Builds

Part 9 of the OBC governs the construction of new housing and small buildings. If you are building a custom home from the ground up that includes an integrated secondary suite, or if your home is less than five years old, Part 9 is your rulebook. It is prescriptive, meaning it offers a "one-size-fits-all" set of high standards that all new structures must meet.

Part 11: The "Renovation" Rulebook

Part 11 is designed specifically for existing buildings undergoing a change of use, extension, or alteration. If your home is older than five years, Part 11 acts as a "gatekeeper." Instead of forcing an 80-year-old house to meet modern-day construction standards (which might be physically impossible), Part 11 evaluates the "performance level" of the building and tells us which Part 9 provisions are mandatory and where we can apply Compliance Alternatives.

Key Takeaway: You cannot choose which Part to follow. The age and history of your building dictate the path. For most legal basement conversions in Ontario, Part 11 is our primary tool for achieving compliance.


2. The 2025 OBC Revolution: Major Relaxations for SDUs

The 2025 OBC update is a game-changer for SDU and Second Dwelling Unit compliance. The government has recognized the housing crisis and responded by lowering the technical barriers to creating secondary suites.

Ceiling Heights: The New 1.95m Standard

Historically, basement ceiling heights were a major roadblock. In previous codes, you often needed 2100mm (6ft-11in) over the entire area.

This change significantly reduces the need for expensive underpinning in many older Ontario homes, allowing homeowners to achieve a legal status without digging out their entire basement.

Diagram comparing Part 9 vs Part 11 ceiling heights


3. Fire Safety Reimagined: “Smoke-Tight” vs. “Fire-Rated”

Perhaps the most radical shift in the 2025 Code is how we separate the main house from the secondary suite. For decades, designers had to provide a specific "fire-resistance rating" (usually 30 to 60 minutes) between units.

The Shift to "Smoke-Tight Barriers"

Under the new rules for houses with up to two dwelling units, the focus has shifted from fire-containment to smoke-containment.

At KeyDraft Designs, we ensure your SDU meets these 2026 fire and sound requirements while maximizing your budget.

Cross-section of a smoke-tight barrier with Type X drywall


4. Structural Foundations: Underpinning and Wall Removals

Creating a modern, open-concept SDU often requires structural intervention. Whether it’s removing a load-bearing wall to open up a basement living room or underpinning to gain that extra few inches of height, engineering is paramount.

Load-Bearing Wall Removal

Many older homes rely on central masonry or wood-frame walls to support the floors above. Removing these requires a structural engineer to design a steel or LVL beam system. We specialize in these engineered solutions, ensuring your home remains safe while you gain the floor plan flexibility you desire.

Underpinning for Value

If your basement height is currently below the 1.95m threshold, underpinning (lowering the floor) is often the best long-term investment. Not only does it make the unit legal, but it also significantly boosts the property's ROI by creating a space that feels like a primary living area rather than a "basement."


5. Zoning and the Committee of Adjustment: Clearing the Path

Even if your design meets every line of the OBC, you still have to clear the zoning hurdle. In many Ontario municipalities, secondary suites are "permitted as of right," but there are always caveats regarding parking, lot coverage, and setbacks.

Navigating the Committee of Adjustment

If your project deviates from local zoning bylaws: for example, if you want to build a larger garden suite than currently allowed: you will need to go through the Committee of Adjustment. This involves:

  1. Minor Variance Application: Requesting permission to bypass specific zoning rules.
  2. Public Hearing: Presenting your case to a panel.
  3. Expert Representation: Having professional drawings that prove your design is compatible with the neighborhood.

Our team has extensive experience navigating architectural design services at the Committee of Adjustment, helping our clients secure the approvals they need for ambitious projects.

Garden suite site plan with zoning setbacks


6. Your Step-by-Step Compliance Roadmap for 2026

If you are planning to initiate an SDU project in late 2025 or early 2026, follow this chronological guide to ensure success:

  1. Step 1: Feasibility Study. Determine the age of your building. Is it Part 9 or Part 11? Measure your existing ceiling heights and check local zoning.
  2. Step 2: Professional Drawings. Hire an architectural designer to create a site plan, floor plans, and elevations. Ensure they are using the 2025 OBC standards for smoke-tight barriers and interconnected alarms.
  3. Step 3: Engineering Review. If you are removing walls or underpinning, get a structural engineer’s stamp on your drawings.
  4. Step 4: Permit Submission. Submit your application for building permits in Mississauga or your local municipality.
  5. Step 5: Inspection. During construction, ensure the city inspector verifies the "smoke-tight" seals and the egress window dimensions (minimum 0.38 m² with no dimension less than 460mm).

Summary of Benefits: Why Compliance Matters

Building a legal basement or SDU isn't just about avoiding fines; it’s about protecting your investment.

At KeyDraft Designs, we bridge the gap between your vision and the strict requirements of the Ontario Building Code. We handle the technical details so you can focus on the results.

Ready to start your SDU journey?
Contact KeyDraft Designs today for a professional consultation and let us help you unlock the full potential of your property with expert custom home designs and seamless building permits.


Leave a Reply

Your email address will not be published. Required fields are marked *